KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 build
' style=
Date:  4-29-2011
Number of Hours:  1.00
Manual Reference:  Page 7-2
Brief Description:  Tie Downs part #2

I fabricated the spacers for the tie-downs. I decided I'm throwing the crappy bandsaw out. I grabbed my Dremmel with a nice metal cutting disk, and WOW..what a great job it does.

After leaving a bit of metal to sand off, I pulled out stationary table sander and smoothed the edges of the spacers down so that the spacer was 2 inches long.

I marked the pilot hole for the tie-down and drilled it out on the drill press.

I marked every piece to the corresponding spar, indicating which was top and bottom and then tapped the spacers down to the spar. I also drew reference lines vertically and horizontally in the centres of the spar holes that will take the bolts for the tie-down.
' style=

Spacers cut to size

Spacers cut to size

' style=

Pilot hole marked

Pilot hole marked

' style=

Spacers taped and plumb to the spar flange

Spacers taped and plumb to the spar flange

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.